Project: 0784 Yangyang Renewable Energy Project (3MW Wind Power + 1.4MW Small Hydroelectric Power) - Crediting Period Renewal Request
[]
Project 0784: Yangyang Renewable Energy Project (3MW Wind Power + 1.4MW Small Hydroelectric Power)

- project design document (3872 KB)

PDD appendices
Appendix 1 - ER calculation sheet (206 KB)

- crediting period renewal form (75 KB)
Methodologies Used AMS-I.D. ver. 17 - Grid connected renewable electricity generation
VVS Version
Standardized baselines used N/A
Amount of Reductions 9,009 metric tonnes CO2 equivalent per annum
Validation Opinion Validation opinion (409 KB)
Renewal Date 25 Mar 14 (Renewable - Expired)   (view history)  
Renewal no longer possible
Crediting Period (requested for renewal) 10 Feb 14 - 09 Feb 21

Other crediting period(s): 10 Feb 07 - 09 Feb 14
Requests for Issuance
and related documentation