Registration Request for Review Form
CDM project activity/programme of activities registration request review form (CDM-REGR-FORM) (Version 03.0) |
---|
Reference number of the proposed CDM project activity/programme of activities (PoA) submitted for registration | 4667 |
---|---|
Title of the proposed CDM project activity/PoA submitted for registration | Energy efficiency improvements of Pucheng Power Plant through retrofitting turbines in China |
Please indicate, in accordance with paragraphs 37 and 40 of the CDM modalities and procedures, which validation requirement(s) may require review. A list of requirements is provided below. Please provide reasons in support of the request for review. Including any supporting documentation. | |
The following are requirements derived from paragraph 37 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
The following are requirements derived from paragraph 40 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() |
|
![]() |
|
Additional information | |
1. The DOE is requested to further substantiate: (a) the technological barrier and how the CDM has helped it to overcome the barrier; and (b) the first-of-its-kind argument, in particular, to justify the criteria applied to limit to “300 MW class power plants” and to clarify if there have been retrofitting projects in any of the power plants connected to North West power grid; if so, what the uniqueness of the project activity is. In doing so, please refer to VVM v1.2 paragraph 117. 2. The DOE is requested to further explain how it has validated: (a) the assumption made in the investment analysis that the net power export to the grid remains unchanged as reasonable as the project activity increases the installed capacity by 60 MW (from 660 to 720 MW); (b) the baseline and project activity power output, providing details such as the operating hours of the plant; and (c) whether there is any increase in the power export; if so please include this parameter in the sensitivity analysis as per VVM v1.2, paragraph 111.e and EB 51 Annex 58 paragraph 17. 3. The DOE is requested to explain how it has validated the assumptions in the emission reduction calculations; in particular, the net power export to the grid to remain unchanged after the project implementation while the installed capacity is increased from 660 MW to 720 MW according to the page 5 of the PDD. In doing so, please refer to VVM v1.2 paragraph 91 and AM0062 v1 page 8. Further, in case there is an increase in the power exported to the grid, the DOE is requested to explain why the provisions under equation 1 (option a) the methodology is not considered. |
|
Date | 14 Jul 11 |