Issuance Request for Review Form


CDM project activity/programme of activities
issuance request review form (CDM-ISSR-FORM)
(Version 03.0)

Project title of the project activity or programme of activities (PoA) for which issuance is requestedBintulu Combined-Cycle Project STG Unit No.9, Tanjung Kidurong, Bintulu, Sarawak (2594)
DOE that requested for issuance and date of requestLRQA (23 Dec 10)
Please indicate, in accordance with paragraphs 65 of the CDM modalities and procedures, for which reason(s) you request review
Incompetence
Please indicate reasons for the request for review
1. The DOE is requested to clarify how it verified that the monitoring plan and the monitoring are in accordance with the approved methodology considering that the PP have not monitored the NCV of diesel fuel as per methodology requirement (i.e. measurements or reliable local or national data) whereas the IPCC default value was applied.
2. The DOE is requested to clarify how it verified that the PP estimation of gas consumption during the flow meter down time which is based on the specific fuel gas consumption is considered the most conservative assumption theoretically possible as per para 208(a) of the Validation and Verification Manual version 1.2. The DOE should further clarify if other means to define conservativeness are possible and if so provide justifications as to why these means are not considered the most conservative assumption.
Date 08 Mar 11