Project: 2571 Wastewater treatment with Anaerobic Digester at Truong Thinh starch processing plant in Tay Ninh, Vietnam. - History
Project 2571: Wastewater treatment with Anaerobic Digester at Truong Thinh starch processing plant in Tay Ninh, Vietnam.
Request for review Request 1
Request 2
Request 3


EB meeting: EB49
(at which the Board considers the request(s) for review, decides whether to undertake the review and, if so, determine its scope and selects a review team)

Initial comments:
Initial comment (Ref. 2571) (455 KB)
Appendix 1 EPC Agreement (163 KB)
Appendix 2 Decision issued by Ministry of Finance (456 KB)
Appendix 3 Purchase Slips for Electricity VietMa (506 KB)
Appendix 4 Circular, Guiding the Application (199 KB)
Appendix 5 Purchase Slips for Electricity Truong Thinh (928 KB)
Appendix 6 Average wages from JETRO (100 KB)
Appendix 7 Purchase Slip for Coal Viet Ma 20071130 (146 KB)
Appendix 8 Steam Coal Prices (150 KB)
Appendix 9 Purchase Slips for Coal Viet Ma (1124 KB)
Appendix 10 IRR Calculation Spreadsheet with Sensitivity Analysis (134 KB)

Data before corrections

CDM-PDD project design document (478 KB)


PDD appendices
Appendix 1 - IRR calculation (Truong Thinh) (105 KB)
Validation Report Validation report (2044 KB)

Data before acceptance of changes in PDD on 20 Dec 2011

CDM-PDD project design document (781 KB)


PDD appendices
Appendix 1 - Table of Truong Thinh IRR calculation results (19 KB)
Appendix 2 - Truong Thinh IRR calculation with sensitivity analysis(Coal price) (258 KB)
Appendix 3 - Truong Thinh IRR calculation with sensitivity analysis(Investment cost) (270 KB)
Appendix 4 - Truong Thinh IRR calculation with sensitivity analysis(OM cost) (273 KB)