10:36 29 Oct 25
Project:
2469 NISCO Converter Gas Recovery and Utilization for Power Generation Project
- History
| Project | 2469: NISCO Converter Gas Recovery and Utilization for Power Generation Project |
|---|---|
| Request for review |
Request 1
Request 2 Request 3 EB meeting: EB49 (at which the Board considers the request(s) for review, decides whether to undertake the review and, if so, determine its scope and selects a review team) Initial comments: Response from JQA and PP(Ref. 2469) (636 KB)
Appendix 1-22 (25 MB)
|
Data before corrections
| Methodologies Used |
ACM0012 ver. 2 -
Consolidated baseline methodology for GHG emission reductions for waste gas or waste heat or waste pressure based energy system”
|
|---|---|
| CDM-PDD |
project design document (590 KB)
|
| Validation Report |
Validation report (1700 KB)
|

Response from JQA and PP(Ref. 2469)
Appendix 1-22
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: