• Home
  • CDM
  • JI
  • CC:iNet
  • TT:Clear
CDM glossary | Sitemap | FAQ | Contact us | Disclaimer | Extranet | My CDM / Login | Join

UNFCCC

About CDM Governance Rules and Reference Methodologies Standardized Baselines Activity Search Programme of Activities (PoA) CDM co-Benefits Prior Consideration CPA Prior Consideration Validation Requests for Deviation Issuance of CERs Post-Registration Changes Renewal of crediting period CPA-PRC Activities transitioned to A6.4 CDM Registry Stakeholder Interaction Newsroom

Offset now: visit the United Nations Carbon Offset Platform

Connect with us:

twitter facebook linkedin instagram boomerang youtube
UNFCCC radio
Your location: Home > Activity Search
  12:25 01 Jul 25
Project: 6093 Gansu Dunhuang Energy saving modification Project from surplus heat utilization of sodium sulfide furnace of Xiyu mining chemical industry - History
Project 6093: Gansu Dunhuang Energy saving modification Project from surplus heat utilization of sodium sulfide furnace of Xiyu mining chemical industry
Request for review Request 1
Request 2
Request 3
Request 4
Review documentation
Clarification documents JCI_Response_for_RFR (221 KB)
9.26_Clarification on the impact of Na2S production capacity (297 KB)
9.28_Board decision on installing the Raymond Mill (104 KB)
9.29_Presell agreement of Raymond Mill (213 KB)
9.30_Log for Raymond Mill installation (312 KB)
9.31_Historical data of 2010 (476 KB)
9.32_Start order of the waste heat modification activity (75 KB)
9.33_Statement on the Raymond Mill from FSR compile entity (95 KB)


Data before review

CDM-PDD project design document (624 KB)

PDD appendices
Appendix 1 - EIRR calculation sheet-without CDM (267 KB)
Appendix 2 - EIRR calculation sheet-with CDM (219 KB)
Appendix 3 - ER calculation sheet (30 KB)
Validation Report Validation report (2986 KB)