Registration Request for Review Form
CDM project activity/programme of activities registration request review form (CDM-REGR-FORM) (Version 03.0) |
---|
Reference number of the proposed CDM project activity/programme of activities (PoA) submitted for registration | 4032 |
---|---|
Title of the proposed CDM project activity/PoA submitted for registration | Methane Recovery Project of Lianyungang Jinchanglin Alcohol Co., Ltd. |
Please indicate, in accordance with paragraphs 37 and 40 of the CDM modalities and procedures, which validation requirement(s) may require review. A list of requirements is provided below. Please provide reasons in support of the request for review. Including any supporting documentation. | |
The following are requirements derived from paragraph 37 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
The following are requirements derived from paragraph 40 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() |
|
![]() |
|
Additional information | |
1. The DOE is requested to further validate the input values to the investment analysis, in particular: (i) the O&M costs as it is not clear how it has validated: (a) the amount and price of the electricity consumed by the equipment installed for the project activity considering that the alcohol distillery process also requires electricity; (b) the number of people required for the operation of the project activity; and (c) the running cost as it is not clear what this consists of considering that the power, water and the labour costs are covered separately; and (ii) the price and the amount of coal saved by providing validation opinion on the assumptions made such as the operating hours, NCV, boiler efficiency and heat generation rate. In doing so, please refer to VVM version 1.2 paragraph 111 and 113 (c). 2. The DOE is requested to justify the criteria applied for comparison with four “similar” projects to crosscheck the input values of the IRR calculation (investment cost, O&M costs and coal savings). In particular, the DOE shall explain: (a) the similarities of the four projects to the project activity by providing details capacity of the wastewater treatment system, technology used, properties and the quantity of the wastewater, etc.; and (b) why the DOE selected the unit of comparison as cost per unit emission reduction (RMB/tCO2). In doing so, please refer to VVM version 1.2 paragraph 113. (c). 3. The DOE is requested to further validate how the baseline emission from the heat generation was calculated, in particular, why equation 15 (AMS.I.C. version 16) for co-fired system was used while in the baseline, the heat is supplied with coal-fired boiler which has been modified to co-fire biogas and coal. In doing so, please refer to paragraphs 15, 25 and 26 of AMS-I.C v16. 4. The DOE is requested to clarify whether the amount of biogas captured is equal to the amount of biogas fed to the boiler. If not, please include the amount of biogas fed to the boiler as a monitoring parameter as per AMS-I.C. version 16 paragraph 35. |
|
Date | 08 Mar 11 |