Registration Request for Review Form
CDM project activity/programme of activities registration request review form (CDM-REGR-FORM) (Version 03.0) |
---|
Reference number of the proposed CDM project activity/programme of activities (PoA) submitted for registration | 3775 |
---|---|
Title of the proposed CDM project activity/PoA submitted for registration | Low Pressure Gas Recovery Project of Shandong Weifang Hongrun Petrochemical Auxiliary Co., Ltd., China |
Please indicate, in accordance with paragraphs 37 and 40 of the CDM modalities and procedures, which validation requirement(s) may require review. A list of requirements is provided below. Please provide reasons in support of the request for review. Including any supporting documentation. | |
The following are requirements derived from paragraph 37 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
The following are requirements derived from paragraph 40 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() |
|
![]() |
|
Additional information | |
1. The DOE is requested to further explain how it has validated the prevailing practice barrier in line with the VVM version 01.2 paragraph 33 and 117. In doing so, the DOE is requested to provide its validation opinion based on independent investigations and the DOE should also provide information on the number of refineries/petrochemical plants in the region, and whether there are industrial processes with similar or comparable technologies to the project activity in the region. 2. The DOE is requested to further explain how it has validated the investment analysis in particular: (a) why it has not considered the saving from the coal usage given that the PA replaces the coal with the waste gas; and (b) the suitability of the input values in line with the VVM version 01.2 paragraph 111, in particular: (i) the steam cost, as it is not clear whether it has considered the waste gas used for steam generation; (ii) other manufacturing fee, other managing fee and repair fee as it is not clear what cost components fall under these categories and how such costs are applicable for the project activity; (iii) waste gas amount, as the historical data show a higher value and an increasing trend; (iv) the amount of steam consumption; (v) the amount of instrument air consumption; and (vi) the amount of recirculating cooling water consumption. 3. The DOE is requested to further explain how it has validated the sensitivity analysis, in particular: (1) the unlikelihood of the variation of waste gas selling price and the annual operational cost in the sensitivity analysis in line with the VVM version 01.2 paragraph 111 (e); and (b) the exclusion of waste gas amount in as the key parameter given that it constitutes more than 20% of project revenue (EB51 Annex 58 paragraph 17). 4. The DOE is requested to further explain how it has validated the common practice analysis in line with the VVM version 01.2 paragraph 119 and 120. 5. The DOE is requested to further explain how the representative element process is appropriate in line with the AM0055 v1.2 page 10 (the methodology conservatively requires to determine which is the representative element process where the efficiency will be more affected by using waste gas). 6. The DOE is requested to further explain why monitoring of parameters related to the steam consumption, instrument air and cooling water consumption by the project activity are not included, given that the PDD indicates the use of such utilities in the project activity. |
|
Date | 31 Jan 11 |