Project: 2539 Sichuan Jinxi Hydropower Project - Issuance Request
Project 2539: Sichuan Jinxi Hydropower Project
 
ISSUANCE STATUS Issued (on 21 May 12)   completeness check: complete | info & rep check: concluded
Monitoring period 26 Apr 11 - 25 Aug 11
Monitoring report Monitoring report (271 KB)
 
Request for issuance Signed form (337 KB)
Amount of CERs CERs issued up to 31 December 2012: 280,061
Serial Range: Block start: CN-5-557909396-1-1-0-2539     Block end: CN-5-558189456-1-1-0-2539
Verification and certification reports Certification report (113 KB)
Verification report (576 KB)
Additional documents 4th ER Calculation Spreadsheet of Jinxi (22 KB)
2539-Monitoring Report_4th (220 KB)
Appendix1-Clarification for the surface area of reservoir about Jinxi hydropower station (682 KB)
Appendix2-The evidenced about the high water flow from May to August (375 KB)
Appendix3-The Preliminary Design Report of Jinxi Hydropower Project (654 KB)