Reference number of the proposed CDM project activity/programme of activities (PoA) submitted for registration | 2392 |
---|---|
Title of the proposed CDM project activity/PoA submitted for registration | Renkeng Hydropower Project, Longchuan County, Guangdong Province |
Please indicate, in accordance with paragraphs 37 and 40 of the CDM modalities and procedures, which validation requirement(s) may require review. A list of requirements is provided below. Please provide reasons in support of the request for review. Including any supporting documentation. | |
The following are requirements derived from paragraph 37 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
The following are requirements derived from paragraph 40 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() |
|
![]() |
|
Additional information | |
1. The DOE should clarify how it has validated the suitability of the 10% benchmark applied to the project activity, as the ‘Economic Evaluation Code for Small Hydropower Projects’(SL 1995) applies to hydropower projects with an installed capacity below 25 MW, and to hydropower projects with an installed capacity below 50 MW in rural regions. 2. The PP/DOE shall further justify why the 15 out of the 16 identified similar hydropower plants in the province have been excluded for comparison to the project activity in the common practice analysis. |
|
Date | 27 May 09 |