00:32 21 Oct 26
Project:
1850 Jiangxi Liujinba 20MW Hydro Power Project
- Crediting Period Renewal Request
[]
| Project |
1850: Jiangxi Liujinba 20MW Hydro Power Project
- project design document (585 KB)
PDD appendices Appendix 1 - Liujinba Hydropower Project-ER (18 KB)
- crediting period renewal form (99 KB)
|
|---|---|
| Methodologies Used |
ACM0002 ver. 16 -
Grid-connected electricity generation from renewable sources
|
| VVS Version | VVS 9.0 |
| Standardized baselines used | N/A |
| Amount of Reductions | 37,248 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (285 KB)
|
| Renewal Date |
08 Jun 16
(Renewable - Expired)
(view history)
completeness check: complete
info & rep check: concluded
Renewal no longer possible
|
| Crediting Period (requested for renewal) |
04 Feb 16 - 03 Feb 23
Other crediting period(s): 04 Feb 09 - 03 Feb 16 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - Liujinba Hydropower Project-ER
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: