Project: 1818 The Third Cascade Hydropower Station of Niduhe River - Crediting Period Renewal Request
[]
Project 1818: The Third Cascade Hydropower Station of Niduhe River

- project design document (869 KB)

PDD appendices
Appendix 1 - The Third Cascade Hydropower Station of Niduhe River (1818)-ER sheet (27 KB)

- crediting period renewal form (111 KB)
Methodologies Used AMS-I.D. ver. 18 - Grid connected renewable electricity generation
VVS Version VVS-PA 2.0
Standardized baselines used N/A
Amount of Reductions 26,597 metric tonnes CO2 equivalent per annum
Validation Opinion Validation opinion (445 KB)
Renewal Date 08 Jan 21 (Renewable - Expired)   (view history)   completeness check info & rep check: concluded
Renewal no longer possible
Crediting Period (requested for renewal) 11 Dec 15 - 10 Dec 22

Other crediting period(s): 11 Dec 08 - 10 Dec 15
Requests for Issuance
and related documentation