Project: 1478 Fujian Beijin Hydropower Project - Issuance Request
Project 1478: Fujian Beijin Hydropower Project
 
ISSUANCE STATUS Issued (on 08 Oct 10)  
Monitoring period 29 Oct 08 - 28 Sep 09
Monitoring report Monitoring report (497 KB)
 
Request for issuance Signed form (2315 KB)

Before corrections:
Signed form (2315 KB)
Amount of CERs CERs issued up to 31 December 2012: 131,952
Serial Range: Block start: CN-5-224854302-1-1-0-1478     Block end: CN-5-224986253-1-1-0-1478


Before corrections:
131952
Verification and certification reports Certification report (1347 KB)
Verification report (1895 KB)

Before corrections:
Certification report (1300 KB)
Verification report (1428 KB)
Additional documents Appendix 1 Output Data (2087 KB)
Appendix 2 Input Data (1618 KB)
Appendix 3 M1,M2 and M3 On-site check records (1355 KB)
Appendix 4 Monitoring Manual ver.07 (258 KB)
Annex 1 Identification letter of transmission line (356 KB)
Annex 2 Geographic connection diagram (538 KB)
Monitoring Report_Fujian Beijin_Ver04 (614 KB)
Annex 3 The primary ammeter reading and calculation of emission reduction (43 KB)

Before corrections:
Appendix 1 Output Data (2087 KB)
Appendix 2 Input Data (1618 KB)
Appendix 3 M1,M2 and M3 On-site check records (1355 KB)
Appendix 4 Monitoring Manual ver.07 (258 KB)
Annex 1 Identification letter of transmission line (356 KB)
Annex 2 Geographic connection diagram (538 KB)
Monitoring Report_Fujian Beijin_Ver04 (614 KB)
Annex 3 The primary ammeter reading and calculation of emission reduction (43 KB)
Request for review Request 1
Request 2
Request 3


EB meeting: EB56
(at which the Board considers the request(s) for review, decides whether to undertake the review and, if so, determine its scope and selects a review team)

Initial comments:
Response to request for review_Fujian Beijin Hydropower Project (193 KB)
Attachment 1_Export reading on Oct.29'08-Sep.28'09 (2247 KB)
Attachment 2_Power Purchase and Sale Agreement (466 KB)