07:12 11 Jul 26
Project:
2359 7.5 MW Bundled Small Hydropower Project in Qiandongnan Autonomous Region, Guizhou Province, P.R. China
- History
Data before corrections
| CDM-PDD |
project design document (1707 KB)
PDD appendices Appendix 1 - CDM Consulting Contract (875 KB)
Appendix 2 - Board Directors Decision (417 KB)
Appendix 3 - IRR spread sheet (Cengong Sandengkan) (73 KB)
Appendix 4 - IRR spread sheet (Qingxin (II)) (73 KB)
Appendix 5 - IRR spread sheet (Wawadong (II)) (73 KB)
|
|---|---|
| Validation Report |
Validation report (1335 KB)
|
Data before approval of the request for post-registration changes on 07 Mar 2013
| Link to PRC form | PRC |
|---|---|
| CDM-PDD |
project design document (2452 KB)
PDD appendices Appendix 1 - PDD ver 06_track changed_7.5MW Boundled Small Hydropower Project 2359 (2454 KB)
|
| Validation opinion on changes in PDD |
Validation opinion on changes in PDD (2226 KB)
|
Data before acceptance of changes in PDD on 12 Aug 2011
| CDM-PDD |
project design document (1737 KB)
PDD appendices Appendix 1 - CDM Consulting Contract (875 KB)
Appendix 2 - Board Directors Decision (417 KB)
Appendix 3 - IRR spread sheet (Cengong Sandengkan) (73 KB)
Appendix 4 - IRR spread sheet (Qingxin (II)) (73 KB)
Appendix 5 - IRR spread sheet (Wawadong (II)) (73 KB)
Appendix 6 - Ref 14_Letter from Kaili Electric Power Supply Bureau (675 KB)
Appendix 7 - ref 13 Guizhou Provincial Price Control Bureau (1250 KB)
Appendix 8 - Water flow rate and operating hour (42 KB)
|
|---|

Response to request for review (2359)
Appendix 03_Wawadong(2)_high tariff
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: