18:24 25 Jan 25
Project:
2359 7.5 MW Bundled Small Hydropower Project in Qiandongnan Autonomous Region, Guizhou Province, P.R. China
- History
Data before corrections
CDM-PDD |
project design document (1707 KB)
PDD appendices Appendix 1 - CDM Consulting Contract (875 KB) Appendix 2 - Board Directors Decision (417 KB) Appendix 3 - IRR spread sheet (Cengong Sandengkan) (73 KB) Appendix 4 - IRR spread sheet (Qingxin (II)) (73 KB) Appendix 5 - IRR spread sheet (Wawadong (II)) (73 KB) |
---|---|
Validation Report | Validation report (1335 KB) |
Data before approval of the request for post-registration changes on 07 Mar 2013
Link to PRC form | PRC |
---|---|
CDM-PDD |
project design document (2452 KB)
PDD appendices Appendix 1 - PDD ver 06_track changed_7.5MW Boundled Small Hydropower Project 2359 (2454 KB) |
Validation opinion on changes in PDD | Validation opinion on changes in PDD (2226 KB) |
Data before acceptance of changes in PDD on 12 Aug 2011
CDM-PDD |
project design document (1737 KB)
PDD appendices Appendix 1 - CDM Consulting Contract (875 KB) Appendix 2 - Board Directors Decision (417 KB) Appendix 3 - IRR spread sheet (Cengong Sandengkan) (73 KB) Appendix 4 - IRR spread sheet (Qingxin (II)) (73 KB) Appendix 5 - IRR spread sheet (Wawadong (II)) (73 KB) Appendix 6 - Ref 14_Letter from Kaili Electric Power Supply Bureau (675 KB) Appendix 7 - ref 13 Guizhou Provincial Price Control Bureau (1250 KB) Appendix 8 - Water flow rate and operating hour (42 KB) |
---|
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: