Project: 2359 7.5 MW Bundled Small Hydropower Project in Qiandongnan Autonomous Region, Guizhou Province, P.R. China - History
Project 2359: 7.5 MW Bundled Small Hydropower Project in Qiandongnan Autonomous Region, Guizhou Province, P.R. China
Request for review Request 1
Request 2
Request 3


EB meeting: EB47
(at which the Board considers the request(s) for review, decides whether to undertake the review and, if so, determine its scope and selects a review team)

Initial comments:
Response to request for review (2359) (335 KB)
Appendix 01_Wawadong(2)_PPA (813 KB)
Appendix 02_Guizhou Provincial Price Control Bureau (Qian Price[2005] 80) (508 KB)
Appendix 03_Wawadong(2)_high tariff (53 KB)
Appendix 04_Cengong Sandengkan_FSR (961 KB)
Appendix 05_Cengong Sandengkan_Investment Budget (2364 KB)
Appendix 06_Cengong Sandengkan_letter from Design Institute (806 KB)
Appendix 07_Qingxing(2)_FSR (2385 KB)
Appendix 08_Qingxing(2)_Investment Budget (1052 KB)
Appendix 09_Wawadong(2)_FSR (701 KB)
Appendix 10_Wawadong(2)_Investment Budget (2637 KB)
Appendix 11_Letter from Kaili Electric Power Supply Bureau (672 KB)
Validation Report (832 KB)
Review Scope (103 KB)

EB meeting: EB48
(at which the report of the review team was/will be considered)

Data before corrections

CDM-PDD project design document (1707 KB)


PDD appendices
Appendix 1 - CDM Consulting Contract (875 KB)
Appendix 2 - Board Directors Decision (417 KB)
Appendix 3 - IRR spread sheet (Cengong Sandengkan) (73 KB)
Appendix 4 - IRR spread sheet (Qingxin (II)) (73 KB)
Appendix 5 - IRR spread sheet (Wawadong (II)) (73 KB)
Validation Report Validation report (1335 KB)

Data before approval of the request for post-registration changes on 07 Mar 2013

Link to PRC form PRC
CDM-PDD project design document (2452 KB)


PDD appendices
Appendix 1 - PDD ver 06_track changed_7.5MW Boundled Small Hydropower Project 2359 (2454 KB)

Validation opinion on changes in PDD Validation opinion on changes in PDD (2226 KB)

Data before acceptance of changes in PDD on 12 Aug 2011

CDM-PDD project design document (1737 KB)


PDD appendices
Appendix 1 - CDM Consulting Contract (875 KB)
Appendix 2 - Board Directors Decision (417 KB)
Appendix 3 - IRR spread sheet (Cengong Sandengkan) (73 KB)
Appendix 4 - IRR spread sheet (Qingxin (II)) (73 KB)
Appendix 5 - IRR spread sheet (Wawadong (II)) (73 KB)
Appendix 6 - Ref 14_Letter from Kaili Electric Power Supply Bureau (675 KB)
Appendix 7 - ref 13 Guizhou Provincial Price Control Bureau (1250 KB)
Appendix 8 - Water flow rate and operating hour (42 KB)