10:07 11 Nov 26
Project
9970 :
BIOGAS RECOVERY AND HEAT GENERATION FROM PALM OIL MILL EFFLUENT (POME), COOPEAGROPAL
| Project title |
BIOGAS RECOVERY AND HEAT GENERATION FROM PALM OIL MILL EFFLUENT (POME), COOPEAGROPAL
- project design document (2702 KB)
PDD appendices Appendix 1 - EF Costa Rica 2012 Final Ver3 (46 MB)
Appendix 2 - Generation_from_Palm_Oil_Mill_Ef__fluent (POME) Coopeagropal _ Spreadsheet 10-04-2014 (127 KB)
Appendix 3 - Thermal Generation ICE 2010-2012 (57 KB)
Appendix 4 - CICR Letter (Official Translation) (996 KB)
Appendix 5 - DNA Letter (Official Translation) (619 KB)
Appendix 6 - SETENA Letter (Official Translation) (836 KB)
Appendix 7 - Letter of approval Coopeagropal English (796 KB)
- registration request form (305 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| Host Parties |
Costa Rica
, involved indirectly
approval (796 KB)
authorization (796 KB)
Authorized Participants: Cooperativa Agroindustrial de Servicios Múltiples de Productores de Palma Aceitera R.L., Coopeagropal R.L. |
| Other Parties Involved | n/a |
| Sectoral scopes |
1 : Energy industries (renewable - / non-renewable sources)
13 : Waste handling and disposal |
| Activity Scale | SMALL |
| Methodologies Used |
AMS-III.H. ver. 16 -
Methane recovery in wastewater treatment
AMS-I.C. ver. 19 - Thermal energy production with or without electricity AMS-I.F. ver. 2 - Renewable electricity generation for captive use and mini-grid |
| Standardized baselines used | N/A |
| Amount of Reductions | 34,634 metric tonnes CO2 equivalent per annum |
| Fee level | USD 5426.8 |
| Validation Report |
VVS/VVM version:
VVS 6.0
Validation report (1342 KB)
Public availability information
Link to information uploaded for public availability |
| Modalities of Communication |
MoC Annex 1 Modalities of Communication valid as of 01/12/2014 |
| Registration Date | 26 Aug 14 (Date of registration action 24 Nov 14) (view history) completeness check: complete info & rep check: concluded |
| Crediting Period | 26 Aug 14 - 25 Aug 24 (Fixed) |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - EF Costa Rica 2012 Final Ver3
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: