23:02 10 Nov 26
Project
5292 :
Installation of a high-pressure/high-efficiency bagasse boiler to cogenerate heat and power
| Project title |
Installation of a high-pressure/high-efficiency bagasse boiler to cogenerate heat and power
- project design document (572 KB)
PDD appendices Appendix 1 - Emission Reductions Ledesma (442 KB)
Appendix 2 - Investmen Analysis Ledesma (433 KB)
- registration request form (83 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| Host Parties |
Argentina
, involved indirectly
approval (290 KB)
authorization (290 KB)
Authorized Participants: Ledesma S.A.A.I. |
| Other Parties Involved | n/a |
| Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
| Activity Scale | LARGE |
| Methodologies Used |
ACM0006 ver. 11 -
Consolidated methodology for electricity and heat generation from biomass residues
|
| Standardized baselines used | N/A |
| Amount of Reductions | 45,434 metric tonnes CO2 equivalent per annum |
| Fee level | USD 7586.8 |
| Validation Report |
Validation report (1407 KB)
Public availability information
Link to information uploaded for public availability |
| Modalities of Communication |
MoC Annex 1 Modalities of Communication valid as of 28/08/2012 |
| Registration Date | 15 Dec 11 (Date of registration action 09 Mar 12) (view history) completeness check: complete info & rep check: concluded |
| Crediting Period |
15 Dec 11 - 14 Dec 18
(Renewable - Expired)
Renewal no longer possible
|
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - Emission Reductions Ledesma
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: