05:40 22 Dec 25
Project:
4744 BRT Zhengzhou, China
- History
| Project | 4744: BRT Zhengzhou, China |
|---|
Data before approval of the request for post-registration changes on 25 Apr 2017
| Link to PRC form | PRC |
|---|---|
| Methodologies Used |
AM0031 ver. 3 -
Baseline Methodology for Bus Rapid Transit Projects
|
| CDM-PDD |
project design document (1333 KB)
PDD appendices Appendix 1 - ER Sheet (205 KB)
Appendix 2 - Operational Cost Sheet (143 KB)
|

project design document
Appendix 1 - ER Sheet
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: