Project: 4744 BRT Zhengzhou, China - History
Project 4744: BRT Zhengzhou, China

Data before approval of the request for post-registration changes on 25 Apr 2017

Link to PRC form PRC
Methodologies Used AM0031 ver. 3 - Baseline Methodology for Bus Rapid Transit Projects
CDM-PDD project design document (1333 KB)


PDD appendices
Appendix 1 - ER Sheet (205 KB)
Appendix 2 - Operational Cost Sheet (143 KB)