Project 6420 : Shannipo Hydropower Project on Beipan River in Guizhou Province
Project title Shannipo Hydropower Project on Beipan River in Guizhou Province
- project design document (1066 KB)

PDD appendices
Appendix 1 - Shannipo ER calculation spreadsheet_20120529 (61 KB)
Appendix 2 - Shannipo IRR calculation spreadsheet_20120326 (137 KB)


- registration request form (935 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
Host Parties China , involved indirectly approval (706 KB) authorization (706 KB)
Authorized Participants: Guizhou Xiyuan Power Generation Co., Ltd.
Other Parties Involved United Kingdom of Great Britain and Northern Ireland , involved indirectly approval (55 KB) authorization (55 KB)
Authorized Participants: Deutsche Bank AG, London Branch (withdrawn)
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
Activity Scale LARGE
Methodologies Used ACM0002 ver. 12 - Consolidated baseline methodology for grid-connected electricity generation from renewable sources
Standardized baselines used N/A
Amount of Reductions 477,016 metric tonnes CO2 equivalent per annum
Fee level USD 93903.2
Validation Report VVS/VVM version: VVM 1.2
Validation report (602 KB) Public availability information
Link to information uploaded for public availability
Modalities of Communication
MoC Annex 1
Modalities of Communication valid as of 03/04/2014
MoC Annex 2 (Withdraw Project Participant) valid as of 02/04/2014
MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 02/04/2014
Registration Date 27 Jun 12 (Date of registration action 05 Sep 12)   (view history)   completeness check: complete info & rep check: concluded
Crediting Period 01 Dec 13 - 30 Nov 20 (Renewable - Expired)
Renewal no longer possible
Requests for Issuance
and related documentation