05:18 18 Jun 25
Registration Request for Review Form
CDM project activity/programme of activities registration request review form (CDM-REGR-FORM) (Version 03.0) |
---|
Reference number of the proposed CDM project activity/programme of activities (PoA) submitted for registration | 4678 |
---|---|
Title of the proposed CDM project activity/PoA submitted for registration | Methane Emission Utilization for Power Generation from Ethanol wastewater treatment at PT. Indonesia Ethanol, Lampung province, Indonesia |
Please indicate, in accordance with paragraphs 37 and 40 of the CDM modalities and procedures, which validation requirement(s) may require review. A list of requirements is provided below. Please provide reasons in support of the request for review. Including any supporting documentation. | |
The following are requirements derived from paragraph 37 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
The following are requirements derived from paragraph 40 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() |
|
![]() |
|
Additional information | |
1. The DOE shall further explain how it has validated the suitability of capital cost and O&M cost of the baseline scenario in line with paragraph 111 (a) and (b) of VVM v1.2. 2. The DOE shall further substantiate the identification of the lagoon design option (W1) in the identification of baseline scenario as per ACM0014 v3 (page 5). In particular, please explain how the capital cost and operational cost of the five lagoon design options has been justified. 3. The DOE shall further substantiate (a) that the parameter CODout,x (COD of the effluent in the period x) and CODin,x (Design COD inflow to the baseline anaerobic lagoon in period x) are appropriate and will result in a conservative estimate of the emission reductions; and (b) how the EFBL,EL,y (baseline emission factor for electricity generated) is determined, in particular the grid emission factor and the emission factor of the electricity generated by the baseline captive co-generation plant. In doing so, please refer to VVM, version 1.2, paragraph 91. |
|
Date | 02 Jul 11 |