00:47 27 Dec 24
Project
3875 :
Hunan Luxi County Nengtan 6.4MW Hydropower Project
Project title |
Hunan Luxi County Nengtan 6.4MW Hydropower Project
- project design document (577 KB) PDD appendices Appendix 1 - IRR spreadsheet_Nengtan (217 KB) Appendix 2 - ER calculations_Nengtan (58 KB) - registration request form (1010 KB) |
---|---|
SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
Host Parties |
China
, involved indirectly
approval (916 KB)
authorization (916 KB)
Authorized Participants: Luxi Nengtan Hydropower Development Limit-liability Company |
Other Parties Involved |
Sweden
, involved indirectly
approval (224 KB)
authorization (224 KB)
Authorized Participants: Carbon Asset Management Sweden AB (withdrawn as of 23/5/2022) |
Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
Activity Scale | SMALL |
Methodologies Used |
AMS-I.D. ver. 15 -
Grid connected renewable electricity generation
|
Standardized baselines used | N/A |
Amount of Reductions | 17,518 metric tonnes CO2 equivalent per annum |
Fee level | USD 2003.6 |
Validation Report |
Validation report (481 KB)
Public availability information
Link to information uploaded for public availability |
Modalities of Communication |
MoC Annex 1 Modalities of Communication valid as of 24/05/2022 MoC Annex 2 (Withdraw Project Participant (Administrative)) valid as of 23/05/2022 MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 25/07/2011 |
Registration Date | 10 Dec 10 (view history) |
Crediting Period |
10 Dec 10 - 09 Dec 17
(Renewable - Expired)
Renewal no longer possible
|
Requests for Issuance
and related documentation |
|
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: