21:09 22 Oct 26
Project:
5351 Huaneng Wuchuan Shilatu Wind Farm Project
- Crediting Period Renewal Request
[]
| Project |
5351: Huaneng Wuchuan Shilatu Wind Farm Project
- project design document (632 KB)
PDD appendices Appendix 1 - Huaneng Wuchuan Shilatu Wind Farm Project(5351)_RCP_ER sheet_v4.0 (16 KB)
- crediting period renewal form (362 KB)
|
|---|---|
| Methodologies Used |
ACM0002 ver. 19 -
Grid-connected electricity generation from renewable sources
|
| VVS Version | VVS-PA 2.0 |
| Standardized baselines used | N/A |
| Amount of Reductions | 91,159 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (797 KB)
|
| Renewal Date | 26 Dec 19 (Renewable) (view history) completeness check: complete info & rep check: concluded |
| Crediting Period (requested for renewal) |
11 Jan 19 - 10 Jan 26
Other crediting period(s): 11 Jan 12 - 10 Jan 19 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - Huaneng Wuchuan Shilatu Wind Farm Project(5351)_RCP_ER sheet_v4.0
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: