Registration Request for Review Form
CDM project activity/programme of activities registration request review form (CDM-REGR-FORM) (Version 03.0) |
---|
Reference number of the proposed CDM project activity/programme of activities (PoA) submitted for registration | 5313 |
---|---|
Title of the proposed CDM project activity/PoA submitted for registration | 10 MW Biomass based power Plant at Pollachi,Coimbatore district, Tamil Nadu |
Please indicate, in accordance with paragraphs 37 and 40 of the CDM modalities and procedures, which validation requirement(s) may require review. A list of requirements is provided below. Please provide reasons in support of the request for review. Including any supporting documentation. | |
The following are requirements derived from paragraph 37 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
The following are requirements derived from paragraph 40 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() |
|
![]() |
|
Additional information | |
1) The DOE is required to clarify how it validated; a) the project description which states that only surplus biomass will be utilized, considering that coal consumption is included in the monitoring plan and coal price is included in the calculation of the average fuel price. In doing so, it may incorporate the correct description of the project in the relevant sections of the PDD and validation report. b) the suitability of the price for each biomass fuel (coconut residues, Prosopis juliflora, saw dust and wood chips, sugarcane trash) as well as the price of coal, considered in the DPR (02 May 2009) c) the suitability of the average fuel price (INR 2,185/ tonne) considering that the Tamilnadu Electricity Regulatory Commission tariff order (27 April 2009) indicates a lower average biomass price of INR 2,000/ tonne; and d) a project IRR of 9.6% (Verification report, page 18) with INR 2,000/tonne (based on the TNERC order) as in the same report on page 20, it is stated that with a decrease of 9.94% on the average biomass price assumed in the DPR (corresponding to INR 2,185 - 9.94% = INR 1,967.8/tonne) the IRR reaches the 13.2% benchmark. In doing so, please provide the relevant calculations in the IRR spreadsheet. Please refer to VVM v1.2 paragraphs 58 and 111 a, b. |
|
Date | 30 Dec 11 |