Registration Request for Review Form
CDM project activity/programme of activities registration request review form (CDM-REGR-FORM) (Version 03.0) |
---|
Reference number of the proposed CDM project activity/programme of activities (PoA) submitted for registration | 4420 |
---|---|
Title of the proposed CDM project activity/PoA submitted for registration | Pure-low Temperature Waste Heat Recovery for Power Generation (12MW) in Hunan Cement Co., Ltd. of Zhaoshan Xinxing Group (ZSHN) |
Please indicate, in accordance with paragraphs 37 and 40 of the CDM modalities and procedures, which validation requirement(s) may require review. A list of requirements is provided below. Please provide reasons in support of the request for review. Including any supporting documentation. | |
The following are requirements derived from paragraph 37 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
The following are requirements derived from paragraph 40 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() |
|
![]() |
|
Additional information | |
1.The DOE shall further justify the suitability of the input values to the investment analysis in line with the paragraphs 113 (c) of VVM v1.2, in particular, the annual O & M cost of the proposed activity (each element of the annual O&M cost should be separately validated including the further explanation on what basis the reserve capacity fee has been determined). 2.The DOE should further substantiate the elimination of baseline alternative P7 (waste energy based captive electricity generation with lower efficiency than the project activity), in particular, how it has validated that either P7: i) has prohibitive barriers; or ii) is clearly economic unattractive as required by step 3 of identification of baseline scenarios of ACM0012 v3.2. 3.The DOE should further substantiate means of validation of fcap in line with ACM0012 v3.2 and paragraph 89-92 of VVM v1.2, in particular: (i) why fcap has not been calculated for each clinker production line (how it has validated the variation in waste heat availability in the both new and existing clinker production lines given that they have different capacities); (ii) how QOE,BL and QOE,y have been validated. In responding to this issue, the DOE should provide information (for both existing and new clinker production lines) on: (i) the quantity and energy content of the waste energy produced for the rated plant capacity/per unit of product produced; (ii) use of the waste heat to meet the internal energy demand of the clinker production lines; (iii) current practice in cement industry of using the waste heat to meet internal energy demand; (iv) total energy demand of the industrial facility; (v) specific energy consumption of the clinker production. 4.The PP shall measure the quantity of electricity supplied to the recipient plant by the project activity at the recipient plant and the generation plant for cross check as per the requirement of the methodology ACM0012 v3.2 ( pg no 40 and 41). |
|
Date | 11 Apr 11 |