Project 4289 : Utilisation of the thermal energy of clinker cooler waste gas and pre-heater flue gas for power generation at a cement plant in Madhya Pradesh
Project title Utilisation of the thermal energy of clinker cooler waste gas and pre-heater flue gas for power generation at a cement plant in Madhya Pradesh
- project design document (679 KB)

PDD appendices
Appendix 1 - 4289 ER Sheet (35 KB)
Appendix 2 - 4289-IRR Sheet (127 KB)


- registration request form (1132 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
Host Parties India , involved indirectly approval (179 KB) authorization (179 KB)
Authorized Participants: Birla Corporation Limited
Other Parties Involved n/a
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
4 : Manufacturing industries
Activity Scale LARGE
Methodologies Used AM0024 ver. 2 - Baseline methodology for greenhouse gas reductions through waste heat recovery and utilization for power generation at cement plants
Standardized baselines used N/A
Amount of Reductions 75,087 metric tonnes CO2 equivalent per annum
Fee level USD 13517.4
Validation Report Validation report (1525 KB) Public availability information
Link to information uploaded for public availability
Modalities of Communication
Registration Date Rejected   (view history)   completeness check: complete info & rep check: concluded
Crediting Period 01 Apr 11 - 31 Mar 21 (Fixed)