23:50 08 Nov 24
Project
4289 :
Utilisation of the thermal energy of clinker cooler waste gas and pre-heater flue gas for power generation at a cement plant in Madhya Pradesh
Project title |
Utilisation of the thermal energy of clinker cooler waste gas and pre-heater flue gas for power generation at a cement plant in Madhya Pradesh
- project design document (679 KB) PDD appendices Appendix 1 - 4289 ER Sheet (35 KB) Appendix 2 - 4289-IRR Sheet (127 KB) - registration request form (1132 KB) |
---|---|
SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
Host Parties |
India
, involved indirectly
approval (179 KB)
authorization (179 KB)
Authorized Participants: Birla Corporation Limited |
Other Parties Involved | n/a |
Sectoral scopes |
1 : Energy industries (renewable - / non-renewable sources)
4 : Manufacturing industries |
Activity Scale | LARGE |
Methodologies Used |
AM0024 ver. 2 -
Baseline methodology for greenhouse gas reductions through waste heat recovery and utilization for power generation at cement plants
|
Standardized baselines used | N/A |
Amount of Reductions | 75,087 metric tonnes CO2 equivalent per annum |
Fee level | USD 13517.4 |
Validation Report |
Validation report (1525 KB)
Public availability information
Link to information uploaded for public availability |
Modalities of Communication | |
Registration Date | Rejected (view history) completeness check: complete info & rep check: concluded |
Crediting Period | 01 Apr 11 - 31 Mar 21 (Fixed) |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: