17:27 27 Apr 25
Registration Request for Review Form
CDM project activity/programme of activities registration request review form (CDM-REGR-FORM) (Version 03.0) |
---|
Reference number of the proposed CDM project activity/programme of activities (PoA) submitted for registration | 4289 |
---|---|
Title of the proposed CDM project activity/PoA submitted for registration | Utilisation of the thermal energy of clinker cooler waste gas and pre-heater flue gas for power generation at a cement plant in Madhya Pradesh |
Please indicate, in accordance with paragraphs 37 and 40 of the CDM modalities and procedures, which validation requirement(s) may require review. A list of requirements is provided below. Please provide reasons in support of the request for review. Including any supporting documentation. | |
The following are requirements derived from paragraph 37 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
The following are requirements derived from paragraph 40 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() |
|
![]() |
|
Additional information | |
1. The DOE shall further substantiate the suitability of the input values to the investment analysis, in particular, whether the Technical Offer is available at the time of investment decision, as it is reported to be the source of the auxiliary power consumption for WHR based power plant and the amount of waste gas. In doing so, please refer to paragraph 6 of the “Guidance on the Assessment of Investment Analysis” (EB 62, Annex 5). 2. The DOE shall further justify the elimination of baseline alternatives related to electricity import from the grid, and captive power generation using different fuel options. In doing so, the DOE should explain how it has validated that either they: a) have prohibitive barriers; or b) are clearly economic unattractive, as required by Step 3 of “Identification of baseline scenario” of AM0024 v02.1. 3. The DOE shall further explain how it has accepted the capacity of the new coal based power plant in the baseline scenario and a power plant with capacity to eliminate power from the grid, considering that remaining power demand of 38.9 million kWh would be imported from the grid (VR, page 15). 4. The DOE shall further substantiate the suitability of input values applied in the project emission calculation, in particular the pre-project energy consumption per unit of output of the clinker (EIB), given that that clinker production lines have been upgraded in September 2009 and July 2010 respectively, and as (a) it is unclear how the average annual energy consumed (i.e. FB) is determined; and (b) annual clinker output (Oclinker,B) is calculated using the rated capacity of the clinker production lines, instead of the historical value of the annual clinker production, as required by the methodology. 5. The PP shall further justify: (a) why the following parameters are not included in the monitoring plan: (i) OXIDfuel (oxidation ratio of fuel used in clinker production), (ii) OXIDfuel/igs (oxidation ratio of fuel used in coal plant), (iii) EFCO2, fuel,y (CO2 emission factor per unit of the fuel used) and (iv) COEF fuel,y (emission factor of fuel used in the clinker production); and (b) the reporting frequency for NCVfuel,y , in line with the applied methodology AM0024 v02.1. |
|
Date | 07 Sep 11 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: