Reference number of the proposed CDM project activity/programme of activities (PoA) submitted for registration4226
Title of the proposed CDM project activity/PoA submitted for registrationUtilisation of the thermal energy content of the waste gas of clinker cooler and pre-heater for power generation at a cement plant in Rajasthan
Please indicate, in accordance with paragraphs 37 and 40 of the CDM modalities and procedures, which validation requirement(s) may require review. A list of requirements is provided below. Please provide reasons in support of the request for review. Including any supporting documentation.
The following are requirements derived from paragraph 37 of the CDM modalities and procedures:
The participation requirements as set out in paragraph 28 to 30 of the CDM modalities and procedures are satisfied;

Comments by local stakeholders have been invited, a summary of the comments received has been provided, and a report to the designated operational entity (DOE) on how due account was taken of any comments has been received;

Project Participants have submitted to the DOE documentation on the analysis of the environmental impacts of the project activity, including transboundary impacts and, if those impacts are considered significant by the project participants or the host Party, have undertaken an environmental impact assessment in accordance with procedures as required by the host Party;

The project activity is expected to result in a reduction in anthropogenic emissions by sources of greenhouse gases that are additional to any that would occur in the absence of the proposed project activity, in accordance with paragraphs 43 to 52 of the CDM modalities and procedures;

The baseline and monitoring methodologies comply with requirements pertaining to methodologies previously approved by the Executive Board;

Provisions for monitoring, verification and reporting are in accordance with decision 17/CP.7, the CDM modalities and procedures and relevant decisions of the COP/MOP;

The project activity conforms to all other requirements for CDM project activities in decision 17/CP.7, the CDM modalities and procedures and relevant decisions by the COP/MOP and the Executive Board.
The following are requirements derived from paragraph 40 of the CDM modalities and procedures:
The DOE shall, prior to the submission of the validation report to the Executive Board, have received from the project participants written approval of voluntary participation from the designated national authority of each Party involved, including confirmation by the host Party that the project activity assists it in achieving sustainable development;

In accordance with provisions on confidentiality contained in paragraph 27(h) of the CDM modalities and procedures, the DOE shall make publicly available the project design document;

The DOE shall receive, within 30 days, comments on the validation requirements from Parties, stakeholders and UNFCCC accredited non-governmental organizations and make them publicly available;

After the deadline for receipt of comments, the DOE shall make a determination as to whether, on the basis of the information provided and taking into account the comments received, the project activity should be validated;

The DOE shall inform project participants of its determination on the validation of the project activity. Notification to the project participants will include confirmation of validation and the date of submission of the validation report to the Executive Board;

The DOE shall submit to the Executive Board, if it determines the proposed project activity to be valid, a request for registration in the form of a validation report including of the project design document, the written approval of the host Party and an explanation of how it has taken due account of comments received.
There are only minor issues which should be addressed by the DOE/project participants prior to the registration of the project.
Additional information
1.The DOE shall further justify the suitability of the input values to the investment analysis in line with the paragraphs 111 (b) of VVM v1.2, in particular: (i) the total investment cost of the baseline and the proposed activity; (ii) the auxiliary consumption of the baseline and the proposed activity; and (iii) the annual O & M cost of the proposed activity (each element of the annual O&M cost should be separately validated) given that the DOE has not validated the suitability of these input values by cross checking against third party or publicly available sources.

2.The DOE shall further substantiate the accuracy of the plant load factor in line with the paragraph 111(a) of VVM v1.2 given that there is an inconsistency between the plant load factor (80%) determined based on technical scheme provided by the technology supplier and the PLF (57%) applied the investment analysis.

3.The DOE shall further substantiate the elimination of two baseline alternatives i.e. electricity import from grid and captive power generation using different fuel options, in particular, how it has validated that either they: i) have prohibitive barriers; or ii) are clearly economic unattractive as required by step 3 of Identification of baseline scenarios of AM0024 v02.1.

4.The DOE shall further substantiate means of validation of COEFIGS , COEF fuel,y and EIB in line with AM0024 v2.1 and paragraph 89-92 of VVM v1.2, in particular: (i) why the value of COEFIGS and COEF fuel,y are not calculated as required by the methodology ( page no 12 of methodology); and (ii) why EIB is not calculated using the historical value of the annual clinker production (6,91,254 t/yr) for BCW as required by the methodology.

5.The PP shall include the monitoring of OXID fuel (oxidation ratio of fuel used in clinker production) and OXID fuel/igs (oxidation ratio of fuel used in coal plant) as per the requirement of the methodology.

6.The DOE shall further justify why the reporting frequency for COEF fuel,y, NCVfuel,y , EF CO2,fuel,y are not in compliance with the applied methodology AM0024 v02.1.
Date 12 Apr 11