02:08 14 Jul 26
Project:
4126 Huaneng Tongliao Kezuozhongqi Xibaiyin Wind Farm Project
- Crediting Period Renewal Request
[]
| Project |
4126: Huaneng Tongliao Kezuozhongqi Xibaiyin Wind Farm Project
- project design document (874 KB)
PDD appendices Appendix 1 - Huaneng Tongliao Kezuozhongqi Xibaiyin Wind Farm Project (4126)_ER sheet for RCP_Ver 3.2 (15 KB)
Appendix 2 - List of documents submitted_Huaneng Tongliao Kezuozhongqi Xibaiyin Wind Farm Project (36 KB)
- crediting period renewal form (106 KB)
|
|---|---|
| Methodologies Used |
ACM0002 ver. 19 -
Grid-connected electricity generation from renewable sources
|
| VVS Version | VVS-PA 2.0 |
| Standardized baselines used | N/A |
| Amount of Reductions | 103,362 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (698 KB)
|
| Renewal Date |
26 Jun 19
(Renewable - Expired)
(view history)
completeness check: complete
info & rep check: concluded
Renewal no longer possible
|
| Crediting Period (requested for renewal) |
25 Jan 18 - 24 Jan 25
Other crediting period(s): 25 Jan 11 - 24 Jan 18 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - Huaneng Tongliao Kezuozhongqi Xibaiyin Wind Farm Project (4126)_ER sheet for RCP_Ver 3.2
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: