19:46 28 Nov 26
Project
4084 :
Chongqing Datong Coalmine VAM Destruction and Utilization Project
| Project title |
Chongqing Datong Coalmine VAM Destruction and Utilization Project
- project design document (699 KB)
PDD appendices Appendix 1 - 4084 ER sheet (30 KB)
Appendix 2 - 4084 IRR Sheet (62 KB)
- registration request form (183 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| Host Parties |
China
, involved indirectly
approval (585 KB)
authorization (585 KB)
Authorized Participants: Chongqing Dongjiang Songzao Renewable Energy Development Co., Ltd. |
| Other Parties Involved |
Netherlands
, involved indirectly
approval (160 KB)
authorization (160 KB)
Authorized Participants: AES Carbon Exchange, Ltd. (withdrawn) Switzerland , involved indirectly approval (65 KB)
authorization (65 KB)
Authorized Participants: AES Carbon Exchange, Ltd. (withdrawn) |
| Sectoral scopes |
8 : Mining/mineral production
10 : Fugitive emissions from fuels (solid, oil and gas) |
| Activity Scale | LARGE |
| Methodologies Used |
ACM0008 ver. 6 -
Consolidated methodology for coal bed methane, coal mine methane and ventilation air methane capture and use for power (electrical or motive) and heat and/or destruction through flaring or flameless oxidation
|
| Standardized baselines used | N/A |
| Amount of Reductions | 183,881 metric tonnes CO2 equivalent per annum |
| Fee level | USD 35276.2 |
| Validation Report |
Validation report (1892 KB)
Public availability information
Link to information uploaded for public availability |
| Modalities of Communication |
MoC Annex 1 Modalities of Communication valid as of 28/09/2012 MoC Annex 2 (Withdraw Project Participant) valid as of 28/09/2012 MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 28/09/2012 MoC Annex 2 (Add Project Participant) valid as of 29/12/2011 |
| Registration Date | 16 Feb 11 (Date of registration action 27 May 11) (view history) |
| Crediting Period |
16 Feb 11 - 15 Feb 18
(Renewable - Expired)
Renewal no longer possible
|
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - 4084 ER sheet
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: