Registration Request for Review Form
CDM project activity/programme of activities registration request review form (CDM-REGR-FORM) (Version 03.0) |
---|
Reference number of the proposed CDM project activity/programme of activities (PoA) submitted for registration | 3852 |
---|---|
Title of the proposed CDM project activity/PoA submitted for registration | Reduction in specific energy consumption ratio by installation of energy efficient direct melt technology in PET film manufacturing unit at, Uttaranchal, India |
Please indicate, in accordance with paragraphs 37 and 40 of the CDM modalities and procedures, which validation requirement(s) may require review. A list of requirements is provided below. Please provide reasons in support of the request for review. Including any supporting documentation. | |
The following are requirements derived from paragraph 37 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
The following are requirements derived from paragraph 40 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() |
|
![]() |
|
Additional information | |
1. The DOE is requested to explain how it has validated that the methodology has been correctly applied, and the emission reductions has been correctly calculated, as the energy consumption for the baseline and project activity have not been directly measured and recorded. In doing so, please refer to paragraph 2 of the methodology. 2. The DOE is requested to explain how it has validated the technical lifetime of the baseline equipment in line with paragraph 6 of the methodology. 3. The DOE is requested to explain how it has validated the applied monitoring methodology has been correctly applied, as the energy use and hence the energy savings of the equipments installed has not been metered in accordance with paragraphs 9 & 10 of the methodology. 4. The DOE is requested to clarify the nature of the project activity, as it is unclear whether the project activity is a new facility or an existing facility or sub-system that is being replaced, modified or retrofitted. |
|
Date | 22 Nov 10 |