Reference number of the proposed CDM project activity/programme of activities (PoA) submitted for registration3266
Title of the proposed CDM project activity/PoA submitted for registrationYangquan Yinying Coal Mine Methane (CMM) Power Generation Project of Yangquan City, Shanxi Province, P.R.China
Please indicate, in accordance with paragraphs 37 and 40 of the CDM modalities and procedures, which validation requirement(s) may require review. A list of requirements is provided below. Please provide reasons in support of the request for review. Including any supporting documentation.
The following are requirements derived from paragraph 37 of the CDM modalities and procedures:
The participation requirements as set out in paragraph 28 to 30 of the CDM modalities and procedures are satisfied;

Comments by local stakeholders have been invited, a summary of the comments received has been provided, and a report to the designated operational entity (DOE) on how due account was taken of any comments has been received;

Project Participants have submitted to the DOE documentation on the analysis of the environmental impacts of the project activity, including transboundary impacts and, if those impacts are considered significant by the project participants or the host Party, have undertaken an environmental impact assessment in accordance with procedures as required by the host Party;

The project activity is expected to result in a reduction in anthropogenic emissions by sources of greenhouse gases that are additional to any that would occur in the absence of the proposed project activity, in accordance with paragraphs 43 to 52 of the CDM modalities and procedures;

The baseline and monitoring methodologies comply with requirements pertaining to methodologies previously approved by the Executive Board;

Provisions for monitoring, verification and reporting are in accordance with decision 17/CP.7, the CDM modalities and procedures and relevant decisions of the COP/MOP;

The project activity conforms to all other requirements for CDM project activities in decision 17/CP.7, the CDM modalities and procedures and relevant decisions by the COP/MOP and the Executive Board.
The following are requirements derived from paragraph 40 of the CDM modalities and procedures:
The DOE shall, prior to the submission of the validation report to the Executive Board, have received from the project participants written approval of voluntary participation from the designated national authority of each Party involved, including confirmation by the host Party that the project activity assists it in achieving sustainable development;

In accordance with provisions on confidentiality contained in paragraph 27(h) of the CDM modalities and procedures, the DOE shall make publicly available the project design document;

The DOE shall receive, within 30 days, comments on the validation requirements from Parties, stakeholders and UNFCCC accredited non-governmental organizations and make them publicly available;

After the deadline for receipt of comments, the DOE shall make a determination as to whether, on the basis of the information provided and taking into account the comments received, the project activity should be validated;

The DOE shall inform project participants of its determination on the validation of the project activity. Notification to the project participants will include confirmation of validation and the date of submission of the validation report to the Executive Board;

The DOE shall submit to the Executive Board, if it determines the proposed project activity to be valid, a request for registration in the form of a validation report including of the project design document, the written approval of the host Party and an explanation of how it has taken due account of comments received.
There are only minor issues which should be addressed by the DOE/project participants prior to the registration of the project.
Additional information
1. The DOE is requested to validate the input values used to calculate the project IRR; in particular: i) total static investment breakdown, including the gas transportation system and heat generation equipment, if any; ii) auxiliary materials (288x10kRMB); iii) sales expenses (18x10kRMB); and iv) a re-investment (1776x10k RMB) in the year 16 considering that the lifetime of the plant is 19 years (PDD page 17). In doing so please refer to the VVM ver. 1.1, paragraphs 110 and 112 c.
2. The DOE is requested to confirm if all applicable government subsidies have been considered such as tax exemptions (income tax holiday) and VAT refunds in line with VVM ver. 1.1 paragraph 112 c.
3. The DOE shall further confirm whether the CMM gas was used in the baseline for heat generation. In doing so please refer to the VVM ver. 1.1 paragraph 86 c.
4. The DOE is requested to further justify the elimination of the baseline alternatives that are facing prohibitive barriers, in particular, for CMM flaring, additional captive power plant and heat energy generation considering that it is not clear: (a) what exactly the publications on VAM utilization contain as the validation report only refers to the sources and the links provided are in Chinese; (b) how the current enforcement of the national regulation to utilize CMM gas is considered; (c) what exactly are the current standards applied (such as CMM concentration) to produce captive electricity/heat and to sell gas to the pipeline; and (d) how the heat being generated (40,000 GJ) follows those standards. In doing so, refer to steps 4 and 5, section II Baseline methodology procedure, ACM 0008 ver.5 and VVM ver. 1.1 paragraphs 86.d and 117.
Date 10 Jun 10