Reference number of the proposed CDM project activity/programme of activities (PoA) submitted for registration | 3208 |
---|---|
Title of the proposed CDM project activity/PoA submitted for registration | Tres Hermanos Oil Field Gas Recovery and Utilization Project |
Please indicate, in accordance with paragraphs 37 and 40 of the CDM modalities and procedures, which validation requirement(s) may require review. A list of requirements is provided below. Please provide reasons in support of the request for review. Including any supporting documentation. | |
The following are requirements derived from paragraph 37 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
The following are requirements derived from paragraph 40 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() |
|
![]() |
|
Additional information | |
Minor issue 1: The DOE should confirm that the input values used in the NPV calculation are reasonable, in line with VVM (v01.1), para.110 (a) - (d), in particular the volume of dry gas/condensates for sale and the price of condensates. Minor issue 2: The DOE should confirm how it has validated the elimination of the other plausible scenarios for oil and gas infrastructure (P1-P3, P5) and for the use of gas-lift (O2 - O5) mentioned in the PDD), in line with VVM (v01.1), para.81and 82. Minor issue 3: The DOE should confirm how it has validated that the other alternatives for the use of the associated gas/ gas-lift gas from the project oil wells, are not technically feasible in line with the requirement of the methodology, in particular, the: (a) on-site use for power generation (G3), as the DOE only argues that electricity generation is not part of the core business of the PP; (b) on-site use for LNG production (G4), as the DOE only argues that it is not feasible as no LNG is currently produced, and (c) the recovery, transportation and compression of the associated gas and/or gas-lift gas into a gas pipeline without prior processing, without being registered as a CDM project activity (G7), as the DOE has not provided an opinion on this option. |
|