22:21 19 Nov 26
Project:
3124 Huaneng Tongliao Zhurihe Phase I Wind Farm Project
- Crediting Period Renewal Request
[]
| Project |
3124: Huaneng Tongliao Zhurihe Phase I Wind Farm Project
- project design document (598 KB)
PDD appendices Appendix 1 - 3124_renewal_EF&ER_Calculation (62 KB)
- crediting period renewal form (111 KB)
|
|---|---|
| Methodologies Used |
ACM0002 ver. 19 -
Grid-connected electricity generation from renewable sources
|
| VVS Version | VVS-PA 1.0 |
| Standardized baselines used | N/A |
| Amount of Reductions | 105,936 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (466 KB)
|
| Renewal Date |
27 Dec 18
(Renewable - Expired)
(view history)
completeness check: complete
info & rep check: concluded
Renewal no longer possible
|
| Crediting Period (requested for renewal) |
29 Apr 17 - 28 Apr 24
Other crediting period(s): 29 Apr 10 - 28 Apr 17 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - 3124_renewal_EF&ER_Calculation
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: