05:32 26 Oct 25
Project:
3031 Liaoning Changtu Taiyangshan Phase One 49.5MW Wind Farm Project
- Crediting Period Renewal Request
[]
| Project |
3031: Liaoning Changtu Taiyangshan Phase One 49.5MW Wind Farm Project
- project design document (556 KB)
PDD appendices Appendix 1 - ER sheet (28 KB)
- crediting period renewal form (360 KB)
|
|---|---|
| Methodologies Used |
ACM0002 ver. 19 -
Grid-connected electricity generation from renewable sources
|
| VVS Version | VVS-PA 2.0 |
| Standardized baselines used | N/A |
| Amount of Reductions | 87,734 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (392 KB)
|
| Renewal Date |
02 Nov 19
(Renewable - Expired)
(view history)
completeness check: complete
info & rep check: concluded
Renewal no longer possible
|
| Crediting Period (requested for renewal) |
08 May 17 - 07 May 24
Other crediting period(s): 08 May 10 - 07 May 17 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - ER sheet
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: