Project: 2759 Gansu Qilinsi 111MW Hydropower Project - Crediting Period Renewal Request
[]
Project 2759: Gansu Qilinsi 111MW Hydropower Project

- project design document (513 KB)

PDD appendices
Appendix 1 - ER sheet (43 KB)

- crediting period renewal form (352 KB)
Methodologies Used ACM0002 ver. 19 - Grid-connected electricity generation from renewable sources
VVS Version VVS-PA 2.0
Standardized baselines used N/A
Amount of Reductions 210,532 metric tonnes CO2 equivalent per annum
Validation Opinion Validation opinion (327 KB)
Renewal Date 08 Aug 19 (Renewable - Expired)   (view history)   completeness check: complete info & rep check: concluded
Renewal no longer possible
Crediting Period (requested for renewal) 06 Dec 16 - 05 Dec 23

Other crediting period(s): 06 Dec 09 - 05 Dec 16
Requests for Issuance
and related documentation