09:40 19 Apr 25
Registration Request for Review Form
CDM project activity/programme of activities registration request review form (CDM-REGR-FORM) (Version 03.0) |
---|
Reference number of the proposed CDM project activity/programme of activities (PoA) submitted for registration | 2662 |
---|---|
Title of the proposed CDM project activity/PoA submitted for registration | ID08-WWP-11, Methane Recovery in Wastewater Treatment, Jambi, Indonesia |
Please indicate, in accordance with paragraphs 37 and 40 of the CDM modalities and procedures, which validation requirement(s) may require review. A list of requirements is provided below. Please provide reasons in support of the request for review. Including any supporting documentation. | |
The following are requirements derived from paragraph 37 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
The following are requirements derived from paragraph 40 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() |
|
![]() |
|
Additional information | |
1. The PP/DOE should clarify how the baseline scenario is in line with VVM para. 80, considering that the current wastewater treatment did not fully comply with the discharge standard of 350 mg/l COD during five months in 2008. In addition, the DOE should clarify how it has validated that the same baseline wastewater treatment system applies to the additional methane generation due to the increase in FFB processing capacity considered in the project activity in line with EB 41, Annex 20, para. 16. 2. The PP is requested to clarify the inconsistencies in the information of the monitoring of Qy,ww between section B.7.1 and Annex 4 in the PDD. 3. The PP/DOE are requested to ensure that the monitoring of the kWproject is in line with the requirements of AMS-III.H v.9 and to amend the data parameters names from kWproject, kWbiomass and kWfossil fuel to kWhproject, kWhbiomass and kWhfossil fuel. In addition, the PP/DOE should explain why the consumption of fossil fuel was not included in the monitoring plan as per the requirements of the same methodology (i.e., the PDD should provide a separate table in section B.7.1). |
|
Date | 05 Sep 09 |