06:36 01 Oct 26
Project:
2617 Inner Mongolia Chifeng Saihanba Qingmachang Wind Power Project
- Crediting Period Renewal Request
[]
| Project |
2617: Inner Mongolia Chifeng Saihanba Qingmachang Wind Power Project
- project design document (828 KB)
PDD appendices Appendix 1 - ER Sheet (37 KB)
- crediting period renewal form (333 KB)
|
|---|---|
| Methodologies Used |
ACM0002 ver. 19 -
Grid-connected electricity generation from renewable sources
|
| VVS Version | VVS-PA 2.0 |
| Standardized baselines used | N/A |
| Amount of Reductions | 102,905 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (196 KB)
|
| Renewal Date |
05 Dec 19
(Renewable - Expired)
(view history)
completeness check
info & rep check: concluded
Renewal no longer possible
|
| Crediting Period (requested for renewal) |
04 Mar 17 - 03 Mar 24
Other crediting period(s): 04 Mar 10 - 03 Mar 17 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - ER Sheet
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: