Registration Request for Review Form
CDM project activity/programme of activities registration request review form (CDM-REGR-FORM) (Version 03.0) |
---|
Reference number of the proposed CDM project activity/programme of activities (PoA) submitted for registration | 2466 |
---|---|
Title of the proposed CDM project activity/PoA submitted for registration | Hubei Yichang Qilinguan Daquan River Hydropower Station |
Please indicate, in accordance with paragraphs 37 and 40 of the CDM modalities and procedures, which validation requirement(s) may require review. A list of requirements is provided below. Please provide reasons in support of the request for review. Including any supporting documentation. | |
The following are requirements derived from paragraph 37 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
The following are requirements derived from paragraph 40 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() |
|
![]() |
|
Additional information | |
1. Further clarification is required on how the DOE has validated the suitability of the input values to the investment analysis, as per the guidance of EB 38 paragraph 54(c). 2. Further clarification is sought how the DOE has validated that the project activity is not a de-bundled component of a larger project, in particular, the distance between the project activity and the other hydropower project owned by the same project participants. 3. The DOE is requested to confirm that the ex-ante emission factor of 0.967795 tCO2/MWh complies with the requirements of the methodology regarding the use of the most up-to-date data at the time of validation as the PDD for the GSC used a different emission factor (0.87504 tCO2/MWh). If not, the emission factor should be revised based on the latest available data at the time of commencing validation. 4. Further clarification is sought on how the net electricity supplied by the project activity can be accurately monitored considering the use of a common meter for auxiliary consumption for the project activity and Shanguando Hydropower station. Further, the formula for net electricity supplied in the PDD does not refer to the project activity. 5. Further clarification is sought on the reference to the Xiangjiawan and Nanhe transformer substations in the Annex 4 and PDD (page 30) as the references are not consistent. 6. The consumption of diesel by the DG set should be monitored and accounted for as project emissions. |
|
Date | 15 Jun 09 |