08:47 08 Nov 25
Project
2312 :
Yichun xiaochengshan wind power Project
| Project title |
Yichun xiaochengshan wind power Project
- project design document (857 KB)
PDD appendices Appendix 1 - IRR calculation (289 KB)
- registration request form (508 KB)
|
|---|---|
| SDC description report | Not Available. Please refer to our Further Information on SD-Tool |
| Host Parties |
China
, involved indirectly
approval (1786 KB)
authorization (1786 KB)
Authorized Participants: Yichun Longyuan Wind Power Co., Ltd. |
| Other Parties Involved |
Austria
, involved indirectly
approval (43 KB)
authorization (43 KB)
Authorized Participants: Kommunalkredit Public Consulting GmbH |
| Sectoral scopes | 1 : Energy industries (renewable - / non-renewable sources) |
| Activity Scale | LARGE |
| Methodologies Used |
ACM0002 ver. 7 -
Consolidated methodology for grid-connected electricity generation from renewable sources
|
| Standardized baselines used | N/A |
| Amount of Reductions | 114,606 metric tonnes CO2 equivalent per annum |
| Fee level | USD 21421.2 |
| Validation Report |
Validation report (1103 KB)
Public availability information
Link to information uploaded for public availability |
| Modalities of Communication | |
| Registration Date | Rejected (view history) |
| Crediting Period | 01 Mar 09 - 29 Feb 16 (Renewable) |

project design document
Appendix 1 - IRR calculation
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: