Registration Request for Review Form
CDM project activity/programme of activities registration request review form (CDM-REGR-FORM) (Version 03.0) |
---|
Reference number of the proposed CDM project activity/programme of activities (PoA) submitted for registration | 2219 |
---|---|
Title of the proposed CDM project activity/PoA submitted for registration | Liaoning Changtu Quantou Wind Power Project |
Please indicate, in accordance with paragraphs 37 and 40 of the CDM modalities and procedures, which validation requirement(s) may require review. A list of requirements is provided below. Please provide reasons in support of the request for review. Including any supporting documentation. | |
The following are requirements derived from paragraph 37 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
The following are requirements derived from paragraph 40 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() |
|
![]() |
|
Additional information | |
1. The PP should explain and the DOE should validate the basis and rationale for the change of the electricity tariff assumed in the FSR (approved in Sept. 2006, resulting in an IRR higher than the benchmark due to tariff of 0.5998 RMB/kWh) to the lower tariff (0.5714 RMB/kWh), which has been taken from the Propositional letter of on-grid electricity tariff issued by the local DRC on 08 Jan. 2007, since this sudden change raises doubts on whether this tariff reduction was induced to enable the project to demonstrate additionality. 2. The data used to calculate the grid emission factor in the PDD submitted for registration was not available at the commencement of validation (May 2007). The PP and DOE are therefore requested to amend the grid emission factor using data which was available at this date. |
|
Date | 22 Jan 09 |