11:44 18 Sep 26
Project:
2215 Henan Sanmenxia 25.5MW Wind Power Project
- Crediting Period Renewal Request
[]
| Project |
2215: Henan Sanmenxia 25.5MW Wind Power Project
- project design document (1244 KB)
PDD appendices Appendix 1 - 2215-ER (26 KB)
- crediting period renewal form (47 KB)
|
|---|---|
| Methodologies Used |
ACM0002 ver. 19 -
Grid-connected electricity generation from renewable sources
|
| VVS Version | VVS-PA 2.0 |
| Standardized baselines used | N/A |
| Amount of Reductions | 38,059 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (496 KB)
|
| Renewal Date |
26 Nov 19
(Renewable - Expired)
(view history)
info & rep check: concluded
Renewal no longer possible
|
| Crediting Period (requested for renewal) |
16 Mar 16 - 15 Mar 23
Other crediting period(s): 16 Mar 09 - 15 Mar 16 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - 2215-ER
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: