14:12 29 Nov 26
Project:
2210 Xiaba 20MW Hydro Power Project in Guizhou Province China.
- Crediting Period Renewal Request
[]
| Project |
2210: Xiaba 20MW Hydro Power Project in Guizhou Province China.
- project design document (1093 KB)
PDD appendices Appendix 1 - 2210 CER Calculation (48 KB)
- crediting period renewal form (122 KB)
|
|---|---|
| Methodologies Used |
ACM0002 ver. 18 -
Grid-connected electricity generation from renewable sources
|
| VVS Version | VVS-PA 1.0 |
| Standardized baselines used | N/A |
| Amount of Reductions | 31,094 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (1262 KB)
|
| Renewal Date |
14 Sep 18
(Renewable - Expired)
(view history)
completeness check: complete
info & rep check: concluded
Renewal no longer possible
|
| Crediting Period (requested for renewal) |
27 May 16 - 26 May 23
Other crediting period(s): 27 May 09 - 26 May 16 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - 2210 CER Calculation
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: