Project: 2204 Longwangtan 15MW Hydro Power Project in Guizhou Province - Crediting Period Renewal Request
[]
Project 2204: Longwangtan 15MW Hydro Power Project in Guizhou Province

- project design document (797 KB)

PDD appendices
Appendix 1 - ER Calculation (25 KB)

- crediting period renewal form (40 KB)
Methodologies Used AMS-I.D. ver. 18 - Grid connected renewable electricity generation
VVS Version VVS 9.0
Standardized baselines used N/A
Amount of Reductions 28,584 metric tonnes CO2 equivalent per annum
Validation Opinion Validation opinion (420 KB)
Renewal Date 10 Jun 16 (Renewable - Expired)   (view history)   completeness check: complete info & rep check: concluded
Renewal no longer possible
Crediting Period (requested for renewal) 06 Mar 16 - 05 Mar 23

Other crediting period(s): 06 Mar 09 - 05 Mar 16
Requests for Issuance
and related documentation