Project: 2155 Sichuan Baishuijiang Shuanghe Hydro Power Project - Crediting Period Renewal Request
[]
Project 2155: Sichuan Baishuijiang Shuanghe Hydro Power Project

- project design document (404 KB)

PDD appendices
Appendix 1 - Shuanghe Hydropower-ER (13 KB)

- crediting period renewal form (111 KB)
Methodologies Used ACM0002 ver. 16 - Grid-connected electricity generation from renewable sources
VVS Version VVS 9.0
Standardized baselines used N/A
Amount of Reductions 188,368 metric tonnes CO2 equivalent per annum
Validation Opinion Validation opinion (564 KB)
Renewal Date 29 Jul 16 (Renewable - Expired)   (view history)   completeness check: complete info & rep check: concluded
Renewal no longer possible
Crediting Period (requested for renewal) 27 Jul 16 - 26 Jul 23

Other crediting period(s): 27 Jul 09 - 26 Jul 16
Requests for Issuance
and related documentation