Project 2127 : Waste Gas based Power Generation Project at Ankit Metal & Power Limited
Project title Waste Gas based Power Generation Project at Ankit Metal & Power Limited
- project design document (835 KB)

PDD appendices
Appendix 1 - IRR 1 (126 KB)
Appendix 2 - IRR 2 (74 KB)
Appendix 3 - IRR 3 (29 KB)
Appendix 4 - IRR 4 (28 KB)
Appendix 5 - ER sheet (24 KB)
Appendix 6 - 2127_Appendix1.pdf (313 KB)
Appendix 7 - 2127_Appendix2.pdf (378 KB)
Appendix 8 - 2127_Appendix3.pdf (512 KB)
Appendix 9 - 2127_Appendix4.pdf (421 KB)
Appendix 10 - 2127_Appendix5.pdf (182 KB)
Appendix 11 - 2127_Appendix6.pdf (251 KB)
Appendix 12 - 2127_Appendix7.pdf (348 KB)
Appendix 13 - 2127_Appendix8.pdf (335 KB)
Appendix 14 - 2127_Appendix9.pdf (155 KB)
Appendix 15 - 2127_Appendix10.pdf (142 KB)
Appendix 16 - 2127_Appendix11.pdf (160 KB)
Appendix 17 - 2127_Appendix12.pdf (461 KB)
Appendix 18 - 2127_Appendix13.pdf (124 KB)


- registration request form (501 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
Host Parties India , involved indirectly approval (472 KB) authorization (472 KB)
Authorized Participants: Ankit Metal & Power Limited
Other Parties Involved n/a
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
4 : Manufacturing industries
Activity Scale LARGE
Methodologies Used ACM0012 ver. 2 - Consolidated baseline methodology for GHG emission reductions for waste gas or waste heat or waste pressure based energy system”
Standardized baselines used N/A
Amount of Reductions 26,808 metric tonnes CO2 equivalent per annum
Fee level USD 3861.6
Validation Report Validation report (1317 KB) Public availability information
Link to information uploaded for public availability
Modalities of Communication
Registration Date Rejected   (view history)  
Crediting Period 01 Jul 09 - 30 Jun 19 (Fixed)