Reference number of the proposed CDM project activity/programme of activities (PoA) submitted for registration | 2117 |
---|---|
Title of the proposed CDM project activity/PoA submitted for registration | Heilongjiang Yilan Hezuolinchang Phase II Wind Power Project |
Please indicate, in accordance with paragraphs 37 and 40 of the CDM modalities and procedures, which validation requirement(s) may require review. A list of requirements is provided below. Please provide reasons in support of the request for review. Including any supporting documentation. | |
The following are requirements derived from paragraph 37 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
The following are requirements derived from paragraph 40 of the CDM modalities and procedures: | |
![]() ![]() ![]() ![]() ![]() ![]() |
|
![]() |
|
Additional information | |
1. The DOE is requested to further clarify the suitability of the input values to the investment analysis as per the requirements of EB 38 paragraph 54(c) guidance. 2. The DOE is requested to confirm the appropriateness of the electricity tariff assumed in the PDD, in comparison with previous tariff notifications for similar projects in the same region which commenced since 2002 and whether such information was available at the time the FSR was prepared. 3. The DOE is requested to further clarify how it has validated the investment analysis, in particular, the 5% escalation applied to the operating cost at the same time other input values are fixed. 4. The data used to recalculate the grid emission factor (12/2008) in the PDD submitted for registration was not available at the commencement of validation (10/2008). The PP and DOE are therefore requested to amend the grid emission factor using data, which was available at this date and provide the corresponding calculation of the emission reductions. |
|
Date | 20 Jun 09 |