Project: 2098 The 84 MW New Bong Escape Hydropower Project, Azad Jammu and Kashmir (AJK), Pakistan - Crediting Period Renewal Request
Project 2098: The 84 MW New Bong Escape Hydropower Project, Azad Jammu and Kashmir (AJK), Pakistan

- project design document (991 KB)

PDD appendices
Appendix 1 - ER calculation 2098 (89 KB)

- crediting period renewal form (151 KB)
Methodologies Used ACM0002 ver. 20 - Grid-connected electricity generation from renewable sources
VVS Version VVS-PA 2.0
Standardized baselines used N/A
Amount of Reductions 227,945 metric tonnes CO2 equivalent per annum
Validation Opinion Validation opinion (462 KB)
Renewal Date 17 Dec 20   (view history)   completeness check: complete info & rep check: concluded
Crediting Period (requested for renewal) 30 Sep 19 - 29 Sep 26

Other crediting period(s): 30 Sep 12 - 29 Sep 19
Requests for Issuance
and related documentation