17:04 22 Sep 26
Project:
2069 Cangxi Donghe Dongxi Hydropower Station
- Crediting Period Renewal Request
[]
| Project |
2069: Cangxi Donghe Dongxi Hydropower Station
- project design document (967 KB)
PDD appendices Appendix 1 - Untitled (uploaded 19 Jun 17 05:02:50) (155 KB)
- crediting period renewal form (143 KB)
|
|---|---|
| Methodologies Used |
AMS-I.D. ver. 18 -
Grid connected renewable electricity generation
|
| VVS Version | VVS 9.0 |
| Standardized baselines used | N/A |
| Amount of Reductions | 16,457 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (327 KB)
|
| Renewal Date |
31 Jul 17
(Renewable - Expired)
(view history)
completeness check: complete
info & rep check: concluded
Renewal no longer possible
|
| Crediting Period (requested for renewal) |
31 Mar 17 - 30 Mar 24
Other crediting period(s): 31 Mar 10 - 30 Mar 17 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - Untitled (uploaded 19 Jun 17 05:02:50)
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: