Project: 2049 Heilongjiang Beiantun 49.5MW Wind Power Project - Crediting Period Renewal Request
[]
Project 2049: Heilongjiang Beiantun 49.5MW Wind Power Project

- project design document (695 KB)

PDD appendices
Appendix 1 - ER spreadsheet (43 KB)

- crediting period renewal form (148 KB)
Methodologies Used ACM0002 ver. 19 - Grid-connected electricity generation from renewable sources
VVS Version VVS-PA 2.0
Standardized baselines used N/A
Amount of Reductions 86,073 metric tonnes CO2 equivalent per annum
Validation Opinion Validation opinion (508 KB)
Renewal Date 26 Dec 19 (Renewable - Expired)   (view history)   completeness check: complete info & rep check: concluded
Renewal no longer possible
Crediting Period (requested for renewal) 27 Dec 15 - 26 Dec 22

Other crediting period(s): 27 Dec 08 - 26 Dec 15
Requests for Issuance
and related documentation