14:08 29 Sep 26
Project:
2049 Heilongjiang Beiantun 49.5MW Wind Power Project
- Crediting Period Renewal Request
[]
| Project |
2049: Heilongjiang Beiantun 49.5MW Wind Power Project
- project design document (695 KB)
PDD appendices Appendix 1 - ER spreadsheet (43 KB)
- crediting period renewal form (148 KB)
|
|---|---|
| Methodologies Used |
ACM0002 ver. 19 -
Grid-connected electricity generation from renewable sources
|
| VVS Version | VVS-PA 2.0 |
| Standardized baselines used | N/A |
| Amount of Reductions | 86,073 metric tonnes CO2 equivalent per annum |
| Validation Opinion |
Validation opinion (508 KB)
|
| Renewal Date |
26 Dec 19
(Renewable - Expired)
(view history)
completeness check: complete
info & rep check: concluded
Renewal no longer possible
|
| Crediting Period (requested for renewal) |
27 Dec 15 - 26 Dec 22
Other crediting period(s): 27 Dec 08 - 26 Dec 15 |
| Requests for Issuance
and related documentation |
|

project design document
Appendix 1 - ER spreadsheet
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: