Project: 2032 Heilongjiang Dajiazishan 49.5MW Wind Power Project - Crediting Period Renewal Request
[]
Project 2032: Heilongjiang Dajiazishan 49.5MW Wind Power Project

- project design document (1265 KB)

PDD appendices
Appendix 1 - 2032-ER (31 KB)

- crediting period renewal form (39 KB)
Methodologies Used ACM0002 ver. 19 - Grid-connected electricity generation from renewable sources
VVS Version VVS-PA 2.0
Standardized baselines used N/A
Amount of Reductions 88,109 metric tonnes CO2 equivalent per annum
Validation Opinion Validation opinion (308 KB)
Renewal Date 11 Dec 19 (Renewable - Expired)   (view history)   completeness check: complete info & rep check: concluded
Renewal no longer possible
Crediting Period (requested for renewal) 15 Dec 15 - 14 Dec 22

Other crediting period(s): 15 Dec 08 - 14 Dec 15
Requests for Issuance
and related documentation