Issuance Request for Review Form
CDM project activity/programme of activities issuance request review form (CDM-ISSR-FORM) (Version 03.0) |
---|
Project title of the project activity or programme of activities (PoA) for which issuance is requested | Amatitlan Geothermal Project (2022) |
---|---|
DOE that requested for issuance and date of request | ERM CVS (08 Sep 09) |
Please indicate, in accordance with paragraphs 65 of the CDM modalities and procedures, for which reason(s) you request review | |
Incompetence | |
Please indicate reasons for the request for review | |
1. The methodology requires that CO2 “emissions resulting from combustion of fossil fuels related to the operation of the geothermal plant” shall be considered while the DOE states that “the methodology ACM0002 ver.6 does not require that project emissions from transport should be deducted from emission reductions”. Further clarification is required on how the consumption of diesel by the utilitarian trucks was not for the operation of the geothermal plant. 2. The DOE has not verified how the fossil fuel emission factor was “measured” as per the registered monitoring plan and methodology. Clarification is required. 3. The DOE shall clarify how the implementation of the well AMF-8 and the potential electricity generation from this well is as per the PDD which only includes wells AMF-1,2,3,4,5,6,7. |
|
Date | 11 Dec 09 |